
DOCS-001 Manual, SeaBotix Inc. Users, 150 – 200 Series - Rev B – 27 Jan 10 -
Page 13 of 64
1.3.2
Integrated Control Console
1) Ensure that the power switch is OFF (down position).
2) Engage the tether connector.
3) Plug the power cord into the side panel of the AC power port.
4) Plug the cable into a suitable power source.
NOTE:
Do not use a Signal Conditioning Power Strip, or an Un-Interruptible
Power Supply (UPS) to provide power to the LBV.
5) There is an RS-232 connector which is used for “flashing” the LBV, SONAR
interface and/or tracking responder triggering.
1)
Circuit Breaker
2)
Red LED – POWER
3)
Amber LED – STATUS
4) Video In
5)
AUX Video Out
6)
RS232 Connector
7)
Tether Whip Connection
8) Power Input Connection
NOTE:
Make sure that there is no water or debris on or in the connectors prior to
connecting.
1.4
Pre-Dive Inspection and System Test
Before placing the LBV in the water, it is important to ensure that all systems operate as
they are supposed to. This process should be done each time the LBV is operated and
will only take a moment to perform.