10
Fig. 22
Fig. 23
Fig. 24
Fig. 25
In Fig. 22 and Fig. 23 it is possible to see the correct installation with open and closed gate respectively;
notice the obliged run of the chain inside the pinion group which must not be modified.
For a correct installation follow carefully the indications below:
7.1.
Fix the angle irons with screws (not supplied), to the two extremities of the gate and fix the chain with the
provided tie rod (Fig. 24)
Open position
Closed position
7. CHAIN INSTALLATION
Summary of Contents for LEPUS BOX 120V/24V
Page 18: ...NOTES ...
Page 19: ......