11
Fig. 26
Fig. 27
Fig. 28
7.3.
Install a fillet chain tensioner to two extremity of the gate to regulate the tension of the chain.
NOTE:
Execute this last operation with motor completely released using the provided special release key
7.2.
Install the chain making it pass through the pinion group as in Fig. 26.
The chain must be always in line both vertically and orizontally, if not perfectly aligned (Fig. 27 and Fig. 28) it
may derail from the pinion group or the motor reducer risks a greater effort not allowing the right operating of
the system.
Summary of Contents for LEPUS BOX 120V/24V
Page 18: ...NOTES ...
Page 19: ......