6009-33 Broadband At Sea
Installation
3-4
3.6.
Below Decks Equipment.
3.6.1.
System Configuration
Figure 3-1 Series 09 Simplified Block Diagram
3.6.2.
1.
Install the ACU, Terminal Mounting Strip and Multiplexer Panel in your standard 19” Equipment
Rack.
Installing the Below Deck Equipment
2.
Connect this equipment as shown in the System Block Diagram.
3.
Install and connect your other Below Decks Equipment (ie, Satellite Modem, telephone and
computer equipment).
4.
Connect the two coaxes from the Radome Assembly to the BDE Rack.
5.
Connect Ships Gyro Compass input to the Terminal Mounting Strip on the rear of the BDE Rack.
6.
Connect TMS Transmit mute and positive Satellite ID function lines to Satellite modem.
7.
Connect the appropriate power cable into the receptacle of the racks power strip.
8.
Plug the power cord into a suitable 110, or 220, VAC UPS or AC power outlet.
3.6.3.
The DAC-2202 ACU is installed in a BDE Rack and is one rack unit high. It includes a Terminal Mounting Strip
mounted on the rear of the rack which is also a one rack unit high plate.
Antenna Control Unit Connections
PRELIMINARY
Summary of Contents for 6009-33
Page 3: ...PRELIMINARY ...
Page 4: ...PRELIMINARY ...
Page 8: ...6009 33 Broadband At Sea Introduction viii This Page Intentionally Left Blank PRELIMINARY ...
Page 18: ...6009 33 Broadband At Sea Installation 3 6 This Page Intentionally Left Blank PRELIMINARY ...
Page 66: ...6009 33 Broadband At Sea DRAWINGS 9 2 This Page Intentionally Left Blank PRELIMINARY ...
Page 68: ...PRELIMINARY ...
Page 72: ...PRELIMINARY ...
Page 73: ...PRELIMINARY ...
Page 75: ...PRELIMINARY ...
Page 77: ...PRELIMINARY ...
Page 79: ...PRELIMINARY ...
Page 81: ...PRELIMINARY ...
Page 83: ...PRELIMINARY ...
Page 85: ...PRELIMINARY ...
Page 87: ...PRELIMINARY ...
Page 88: ...PRELIMINARY ...
Page 89: ...PRELIMINARY ...
Page 91: ...PRELIMINARY ...
Page 93: ...PRELIMINARY ...
Page 95: ...PRELIMINARY ...