Introduction
6009-33 Broadband At Sea
v
1.
INTRODUCTION .......................................................................................................................................................................................... 1-1
1.1.
G
ENERAL
S
YSTEM
D
ESCRIPTION
....................................................................................................................................................................... 1-1
1.2.
P
URPOSE
.................................................................................................................................................................................................................. 1-1
1.3.
S
YSTEM
C
OMPONENTS
........................................................................................................................................................................................ 1-1
1.4.
G
ENERAL SCOPE OF THIS MANUAL
.................................................................................................................................................................... 1-2
1.5.
Q
UICK
O
VERVIEW OF CONTENTS
...................................................................................................................................................................... 1-2
2.
OPERATION ..................................................................................................................................................................................................... 2-1
2.1.
S
YSTEM
P
OWER
-
UP
.............................................................................................................................................................................................. 2-1
2.2.
A
NTENNA
I
NITIALIZATION
................................................................................................................................................................................ 2-1
2.3.
A
NTENNA
S
TABILIZATION
................................................................................................................................................................................. 2-1
2.4.
S
TABILIZED
P
EDESTAL
A
SSEMBLY
O
PERATION
............................................................................................................................................. 2-1
2.5.
T
RACKING
O
PERATION
........................................................................................................................................................................................ 2-1
2.6.
A
NTENNA
P
OLARIZATION
O
PERATION
............................................................................................................................................................ 2-1
2.7.
L
OW
N
OISE
B
LOCK
C
ONVERTER
O
PERATION
/S
ELECTION
: ......................................................................................................................... 2-2
2.8.
RF
E
QUIPMENT
..................................................................................................................................................................................................... 2-2
2.9.
FCC
TX
M
UTE
F
UNCTION
................................................................................................................................................................................. 2-2
2.10.
R
ADOME
A
SSEMBLY
O
PERATION
...................................................................................................................................................................... 2-2
3.
INSTALLATION ............................................................................................................................................................................................. 3-1
3.1.
U
NPACKING AND
I
NSPECTION
.......................................................................................................................................................................... 3-1
3.2.
S
ITE
S
ELECTION
A
BOARD
S
HIP
......................................................................................................................................................................... 3-1
3.3.
A
SSEMBLY
N
OTES AND
W
ARNINGS
................................................................................................................................................................. 3-1
3.4.
I
NSTALLING THE
ADE .......................................................................................................................................................................................... 3-2
3.4.1.
Preparing The Single Piece 80.8” Radome Assembly ................................................................................................ 3-2
3.4.2.
Antenna Pedestal Mechanical Checklist ........................................................................................................................... 3-3
3.5.
C
ABLE
I
NSTALLATION
.......................................................................................................................................................................................... 3-3
3.5.1.
Shipboard Cable Installation ................................................................................................................................................... 3-3
3.6.
B
ELOW
D
ECKS
E
QUIPMENT
. ............................................................................................................................................................................... 3-4
3.6.1.
System Configuration................................................................................................................................................................... 3-4
3.6.2.
Installing the Below Deck Equipment ................................................................................................................................ 3-4
3.6.3.
Antenna Control Unit Connections ...................................................................................................................................... 3-4
3.6.4.
Terminal Mounting Strip Connections ............................................................................................................................... 3-5
3.6.5.
Control Cable Connections ....................................................................................................................................................... 3-5
3.6.6.
NMEA GPS, Modem Lock & TX Inhibit Output Cable Connections .................................................................. 3-5
3.6.7.
Ships Gyro Compass Connections ........................................................................................................................................ 3-5
3.6.8.
IF Cable Connections ................................................................................................................................................................... 3-5
3.6.9.
AGC Tracking Input Connections ......................................................................................................................................... 3-5
3.7.
B
ROADBAND
C
ONNECTIONS
B
ELOW
D
ECKS
.................................................................................................................................................. 3-5
3.8.
S
ET
-
UP
&
C
ONFIGURATION
............................................................................................................................................................................... 3-5
4.
SET-UP & CONFIGURATION ................................................................................................................................................................ 4-1
4.1.
O
PERATOR
S
ETTINGS
........................................................................................................................................................................................... 4-1
4.2.
O
PTIMIZING
T
ARGETING
.................................................................................................................................................................................... 4-1
4.3.
O
PTIMIZING
A
UTO
-P
OLARIZATION
TX/RX .................................................................................................................................................. 4-1
4.4.
C
ALIBRATING
R
ELATIVE
A
NTENNA
P
OSITION
(H
OME
F
LAG
O
FFSET
) .................................................................................................... 4-2
4.4.1.
To Calculate HFO: ........................................................................................................................................................................... 4-2
4.4.2.
To Enter the HFO value: .............................................................................................................................................................. 4-4
4.5.
R
ADIATION
H
AZARD AND
B
LOCKAGE
M
APPING
(AZ
LIMIT
PARAMETERS
) ........................................................................................ 4-4
4.6.
TX
P
OLARITY
S
ETUP
............................................................................................................................................................................................ 4-4
4.7.
TRACK
DISP ........................................................................................................................................................................................................ 4-5
PRELIMINARY
Summary of Contents for 6009-33
Page 3: ...PRELIMINARY ...
Page 4: ...PRELIMINARY ...
Page 8: ...6009 33 Broadband At Sea Introduction viii This Page Intentionally Left Blank PRELIMINARY ...
Page 18: ...6009 33 Broadband At Sea Installation 3 6 This Page Intentionally Left Blank PRELIMINARY ...
Page 66: ...6009 33 Broadband At Sea DRAWINGS 9 2 This Page Intentionally Left Blank PRELIMINARY ...
Page 68: ...PRELIMINARY ...
Page 72: ...PRELIMINARY ...
Page 73: ...PRELIMINARY ...
Page 75: ...PRELIMINARY ...
Page 77: ...PRELIMINARY ...
Page 79: ...PRELIMINARY ...
Page 81: ...PRELIMINARY ...
Page 83: ...PRELIMINARY ...
Page 85: ...PRELIMINARY ...
Page 87: ...PRELIMINARY ...
Page 88: ...PRELIMINARY ...
Page 89: ...PRELIMINARY ...
Page 91: ...PRELIMINARY ...
Page 93: ...PRELIMINARY ...
Page 95: ...PRELIMINARY ...