
Table of Contents
5012-91 Installation Manual
v
1.
SERIES 12 KU-BAND SYSTEM CONFIGURATION(S) ........................................................................................................... 1-1
1.1.
S
YSTEM
C
ABLES
............................................................................................................................................................................................. 1-1
1.2.
O
THER
I
NPUTS TO THE
S
YSTEM
.................................................................................................................................................................. 1-1
1.3.
S
IMPLIFIED
B
LOCK
D
IAGRAM OF A
S
ERIES
12
K
U
-B
AND
S
YSTEM
...................................................................................................... 1-1
1.4.
D
UAL
A
NTENNA
C
ONFIGURATION
............................................................................................................................................................. 1-2
1.5.
O
PEN
A
NTENNA
-M
ODEM
I
NTERFACE
P
ROTOCOL
(O
PEN
AMIP™)
S
PECIFICATION
: ........................................................................ 1-3
1.5.1.
Overview: ........................................................................................................................................................................................ 1-3
1.5.2.
Interface requirements: ......................................................................................................................................................... 1-3
1.5.3.
Utilized OpenAMIP
TM
Commands: ................................................................................................................................... 1-4
2.
SITE SURVEY .................................................................................................................................................................................................. 2-1
2.1.
S
ITE
S
ELECTION
A
BOARD
T
HE
S
HIP
.......................................................................................................................................................... 2-1
2.2.
A
NTENNA
S
HADOWING
(B
LOCKAGE
)
AND
RF
I
NTERFERENCE
.............................................................................................................. 2-1
2.3.
M
OUNTING
F
OUNDATION
........................................................................................................................................................................... 2-2
2.3.1.
Mounting on Deck or Deckhouse ...................................................................................................................................... 2-2
2.3.2.
ADE Mounting Considerations ........................................................................................................................................... 2-2
2.3.3.
Sizing of the support pedestal ............................................................................................................................................ 2-2
2.4.
M
OUNTING
H
EIGHT
...................................................................................................................................................................................... 2-3
2.5.
M
AST
C
ONFIGURATIONS
............................................................................................................................................................................. 2-3
2.5.1.
Vertical Masts .............................................................................................................................................................................. 2-4
2.5.2.
Raked Masts .................................................................................................................................................................................. 2-4
2.5.3.
Girder Masts ................................................................................................................................................................................. 2-4
2.5.4.
Truss Mast ..................................................................................................................................................................................... 2-5
2.6.
S
AFE
A
CCESS TO THE
ADE .......................................................................................................................................................................... 2-5
2.7.
B
ELOW
D
ECKS
E
QUIPMENT
L
OCATION
..................................................................................................................................................... 2-5
2.8.
C
ABLES
............................................................................................................................................................................................................. 2-5
2.8.1.
ADE/BDE Coaxial Cables ........................................................................................................................................................ 2-6
2.8.2.
Antenna Power Cable .............................................................................................................................................................. 2-6
2.8.3.
Air Conditioner Power Cable ............................................................................................................................................... 2-6
2.8.4.
ACU Power Cable/Outlet ........................................................................................................................................................ 2-6
2.8.5.
Gyro Compass Cable ................................................................................................................................................................ 2-6
2.9.
G
ROUNDING
.................................................................................................................................................................................................... 2-7
3.
INSTALLATION ............................................................................................................................................................................................. 3-1
3.1.
U
NPACKING AND
I
NSPECTION
.................................................................................................................................................................... 3-1
3.2.
A
SSEMBLY
N
OTES AND
W
ARNINGS
........................................................................................................................................................... 3-1
3.3.
I
NSTALLING THE
ADE ................................................................................................................................................................................... 3-2
3.3.1.
Prepare the 40”, 50”, 60”, 66” or 76” Radome Assembly ....................................................................................... 3-2
3.3.2.
Installing the 50, 60 or 66” Radome Assembly .......................................................................................................... 3-3
3.4.
G
ROUNDING THE
P
EDESTAL
......................................................................................................................................................................... 3-6
3.5.
R
EMOVING THE
S
HIPPING
/S
TOW
R
ESTRAINTS
PRIOR
TO
P
OWER
-U
P
.............................................................................................. 3-7
3.5.1.
Removing the AZ Shipping/Stow Restraint .................................................................................................................. 3-7
3.5.2.
Removing the EL Shipping/Stow Restraint ................................................................................................................... 3-8
3.5.3.
Removing the CL Shipping/Stow Restraint ................................................................................................................ 3-10
3.6.
I
NSTALLING THE
B
ELOW
D
ECKS
E
QUIPMENT
. ........................................................................................................................................ 3-11
3.6.1.
General Cautions & Warnings .......................................................................................................................................... 3-11
3.7.
C
ONNECTING THE
B
ELOW
D
ECKS
E
QUIPMENT
...................................................................................................................................... 3-11
3.7.1.
Connecting the ADE AC Power Cable .......................................................................................................................... 3-11
3.7.2.
Connecting the BDE AC Power Cables ........................................................................................................................ 3-11
3.7.3.
Media Xchange Point™ (MXP) Connections ............................................................................................................. 3-11
Summary of Contents for 5012-91
Page 8: ......
Page 20: ...5012 91 Installation Manual Site Survey 2 8 This Page Intentionally Left Blank...
Page 52: ...5012 91 Installation Manual Setup Ship s Gyro Compass 6 4 This Page Intentionally Left Blank...
Page 74: ...5012 91 Installation Manual Setup Targeting 12 4 This Page Intentionally Left Blank...
Page 84: ...5012 91 Installation Manual Quick Start Operation 14 6 This Page Intentionally Left Blank...
Page 112: ...5012 91 Installation Manual DRAWINGS 19 2 This Page Intentionally Left Blank...
Page 117: ......
Page 118: ......
Page 119: ......
Page 129: ......
Page 137: ......
Page 138: ......