6. The UV unit must be properly grounded for safe and proper operation. Failure to properly ground the UV unit
automatically voids all unit warranty.
7. Line voltage must be within 10.56V to 16.50V. Voltage outside the range will compromise the performance of
the UV unit.
Plumbing Requirements
All piping, tubes and hoses leading to the UV unit connection points must be leak-free before the UV unit can be
installed.
Note:
The UV unit may be installed horizontally or vertically. For vertical installation, make sure the inlet port
is positioned at the bottom.
Installation Procedure
Note:
Do not assemble or install damaged parts. Quartz sleeve and UV lamp are fragile and must be handled
with care.
Install Fittings
Perform this procedure to prepare the UV unit for installation.
1. Inspect each port and fitting to ensure threads are free of dirt, burrs, and excessive nicks. If threads are badly
nicked, replace the fitting.
2. Wrap 1/4” wide PTFE tape 2 to 3 turns counter-clockwise around the male threads of the 1/4” fitting. Do not
wrap tape around the first thread.
3. Screw the fitting into cylinder ports to finger tight position to achieve desired alignment.
4. Do not back-off fitting. Do not over-tighten fitting. Over-tightening could strip the fitting threads and cause leak.
Install Quartz Sleeve
Perform this procedure only when water piping for UV unit is in place and ready for service.
1. Visually inspect quartz sleeve for cracks and damages.
2. Remove the four screws holding the ballast box cover and remove the cover.
3. Remove the rubber boot and pull out the 4-point lamp connector.
4. Remove the compression nuts.
5. Insert the close-end of the quartz sleeve into the cylinder through the ballast box pass-thru.
6. Allowing 1/2” of the quartz sleeve to expose on the viewport pass-thru.
7. Lubricate the tips of the quartz sleeve with clean water and insert new O-ring. Ensure the O-ring has all-round
contact with the cylinder pass-thru.
8. Tighten the compression nut while making sure the nut does not contact the quartz sleeve. Adjust O-ring position
as necessary. The compression nut should be snug and tight, not over-torque.
9. Repeat Step 7 and 8 on the ballast box compression nut.
Connect Plumbing
Tube or hose ends must be cut squared and clean; must have no rough edges. The quick fit elbow fitting has a
C-clamp that will lock the tube in place once inserted.
1. Insert the supply pipe into one cylinder port and label the port “Inlet”.
2. Insert the temporary pipe into the other cylinder port to direct water into a container.
3. Slowly fill the cylinder with water and flush cylinder for 1 minute.
4. Remove temporary pipe and insert the return pipe into the cylinder port and label the port “Outlet”.
5. Slowly pressurize the UV unit by filling the cylinder with water while checking for leaks.
Sea Recovery Aqua Mini 170, 350, 550 and 750
34
Summary of Contents for Aqua Mini 170
Page 2: ......
Page 4: ......
Page 12: ......
Page 18: ......
Page 28: ......
Page 48: ......
Page 66: ......
Page 71: ...Wiring Diagram Aqua Mini 24vdc 69 Electrical...
Page 73: ...71 Electrical...
Page 74: ......
Page 90: ......
Page 97: ...Chapter 12 Exploded Parts View 95...
Page 146: ...1 1 15 11 5 13 6 14 11 5 16 3 8 7 9 4 12 10 2 Sea Recovery Aqua Mini 170 350 550 and 750 144...
Page 148: ...5 7 11 2 1 2 10 6 3 8 4 9 6 3 Sea Recovery Aqua Mini 170 350 550 and 750 146...
Page 153: ...12 8 9 2 10 13 1 3 5 4 14 11 6 15 7 151 Exploded Parts View...
Page 155: ...1 153 Exploded Parts View...
Page 162: ......
Page 163: ...Chapter 13 Appendix 161...
Page 164: ......
Page 165: ......
Page 166: ...FCC Compliance 163 Appendix...