5.5.6 Furnace / Chamber Gauge Switch
If the PROCESS START/STOP button is depressed and active (the green button is lit), the Furnace/Chamber
Gauge switch provides power to the furnace and chamber gauge controller outputs, which in turn provide
power to the actual heater elements. When the switch is in the ENABLE position, the switch lever light
illuminates. This switch can always be used to defeat power to these heaters. Also, when either of the
computer’s fault or end-of-run shutdown timers has elapsed, these heater outputs are disabled until the
PROCESS START/STOP pushbutton is pressed.
5.5.7 Vacuum Switch
The Vacuum switch three-position switch controls the action of the vacuum system. In the VACUUM
position, the vacuum pump will engage and begin to pump the system down. When the pump is running, the
switch lever light illuminates. In the HOLD position, the pump will be disengaged and the integral isolation
valve in the pump will immediately close to preserve most of the vacuum already established in the system. In
the VENT position, the pump will remain off, and the vent solenoid valve will open to purge the system to
atmosphere.
NOTE 1:
Do not
use the HOLD position to test the system for leaks. Under normal operating conditions it is
possible that contamination of the seat of the integral pump isolation valve that will allow air back through the
pump into the system. Consult the Edwards manual, specifically Section 10.
NOTE 2:
There is no override provision for the vacuum control switch. Opening the vent during deposition
would be possible, but would immediately initiate the fault shutdown timer and will have a detrimental effect
on coating quality.
NOTE 3:
If the 2010 is supplied with the LN
2
option, the LN
2
solenoid is enabled when the vacuum switch is
in the evacuate position. The LN
2
option not available in the European Community.
5.5.8 Vaporizer Switch
The Vaporizer switch permits the vaporizer heater elements to be energized as enabled by the sequencing
computer. When switched is in ENABLE position, the switch lever light illuminates, but the heater control
output will not be enabled until the pre-coating conditions have been met. As with the furnace and chamber
gauge heaters, when the fault or end-of-run shutdown timer of the computer has elapsed, the vaporizer heaters
are disabled until the computer is reset.
CAUTION: If the 2010 is supplied with the rotation option, the fixture rotation is
controlled with the vaporizer switch. Whenever the vaporizer switch is on, the fixture
rotates.
5.6 FUSES
To access the fuses, remove the left side panel from the machine. The fuses are located inside the frame of the
2010, below the furnace temperature controller.
Summary of Contents for LABCOTER 2
Page 3: ...OM 610 1002 1 Operator s Manual Rev 37...
Page 4: ...Rev 37 Operator s Manual OM 610 1002 1...
Page 14: ...Rev 37 Operator s Manual OM 610 1002 1 page 6 SECTION 2 OVERVIEW PDS 2010...
Page 44: ......
Page 66: ...Rev 37 Operator s Manual OM 610 1002 1 page 58 SECTION 6 MAINTENANCE PDS 2010...
Page 68: ...Rev 37 Operator s Manual OM 610 1002 1 page 60 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 70: ...Rev 37 Operator s Manual OM 610 1002 1 page 62 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 72: ...Rev 37 Operator s Manual OM 610 1002 1 page 64 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 74: ...Rev 37 Operator s Manual OM 610 1002 1 page 66 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 76: ...Rev 37 Operator s Manual OM 610 1002 1 page 68 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 78: ...Rev 37 Operator s Manual OM 610 1002 1 page 70 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 80: ...Rev 37 Operator s Manual OM 610 1002 1 page 72 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 82: ...Rev 37 Operator s Manual OM 610 1002 1 page 74 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 84: ...Rev 37 Operator s Manual OM 610 1002 1 page 76 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 86: ...Rev 37 Operator s Manual OM 610 1002 1 page 78 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 88: ...Rev 37 Operator s Manual OM 610 1002 1 page 80 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 90: ...Rev 37 Operator s Manual OM 610 1002 1 page 82 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 92: ...Rev 37 Operator s Manual OM 610 1002 1 page 84 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 94: ...Rev 37 Operator s Manual OM 610 1002 1 page 86 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 96: ...Rev 37 Operator s Manual OM 610 1002 1 page 88 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 98: ...Rev 37 Operator s Manual OM 610 1002 1 page 90 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 100: ...Rev 37 Operator s Manual OM 610 1002 1 page 92 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 102: ...Rev 37 Operator s Manual OM 610 1002 1 page 94 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 104: ...Rev 37 Operator s Manual OM 610 1002 1 page 96 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 106: ...Rev 37 Operator s Manual OM 610 1002 1 page 98 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 108: ...Rev 37 Operator s Manual OM 610 1002 1 page 100 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 110: ...Rev 37 Operator s Manual OM 610 1002 1 page 102 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 112: ...Rev 37 Operator s Manual OM 610 1002 1 page 104 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 114: ...Rev 37 Operator s Manual OM 610 1002 1 page 106 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 116: ...Rev 37 Operator s Manual OM 610 1002 1 page 108 SECTION 7 COMPONENT LOCATION PDS 2010...
Page 128: ...Rev 37 Operator s Manual OM 610 1002 1 page 120 SECTION 10 WARRANTY PDS 2010...
Page 130: ...Rev 37 Operator s Manual OM 610 1002 1 page 122 SECTION 10 WARRANTY PDS 2010...
Page 131: ...PDS 2010 SCHEMATICS page 123 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 1 OF 2...
Page 132: ...page 124 SCHEMATICS PDS 2010...
Page 133: ...PDS 2010 SCHEMATICS page 125 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 2 OF 2...
Page 134: ...page 126 SCHEMATICS PDS 2010...
Page 135: ...PDS 2010 SCHEMATICS page 127 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 1 OF 3...
Page 136: ...page 128 SCHEMATICS PDS 2010...
Page 137: ...PDS 2010 SCHEMATICS page 129 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 2 OF 3...
Page 138: ...page 130 SCHEMATICS PDS 2010...
Page 139: ...PDS 2010 SCHEMATICS page 131 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 3 OF 3...
Page 140: ...page 132 SCHEMATICS PDS 2010...
Page 141: ...PDS 2010 SCHEMATICS page 133 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 1 OF 3...
Page 142: ...page 134 SCHEMATICS PDS 2010...
Page 143: ...PDS 2010 SCHEMATICS page 135 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 2 OF 3...
Page 144: ...page 136 SCHEMATICS PDS 2010...
Page 145: ...PDS 2010 SCHEMATICS page 137 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 3 OF 3...
Page 146: ...page 138 SCHEMATICS PDS 2010...
Page 147: ...PDS 2010 SCHEMATICS page 139 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 1 OF 3...
Page 148: ...page 140 SCHEMATICS PDS 2010...
Page 149: ...PDS 2010 SCHEMATICS page 141 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 2 OF 3...
Page 150: ...page 142 SCHEMATICS PDS 2010...
Page 151: ...PDS 2010 SCHEMATICS page 143 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 3 OF 3...
Page 152: ...page 144 SCHEMATICS PDS 2010...