
Assembly and Commissioning
20
12.03|SRU 20 - 60|en
Stop C (5) locks.
5 Actuate air connection "A".
The module swivels to stop C (5) (basic setting 90°).
6 Turn stop C (5) to the required center position.
7 Ventilate air connection "C".
The module swivels to stop B (1).
8 Ventilate air connection "A" and actuate air connection "D".
Stop D (7) locks.
9 Actuate air connection "B".
The module swivels to stop D (7) (basic setting 90°).
10 Turn stop D (7) to the required center position.
11 Re-tighten the screw (4) again (SRU 20-40: 10Nm,
SRU 50-60: 24Nm).
12 Swivel repeatedly to test the center position setting
Page 27)
.
Mounting and adjusting the sensors
The module is prepared for the use of the sensors IN 80 and MMS
22.
1 If you require further information on sensor operation, con-
tact your SCHUNK contact person or download information
from our homepage.
2 Technical data of the sensors are contained in the data sheets
(included in the scope of delivery).
6.7