
Assembly and Commissioning
12
12.03|SRU 20 - 60|en
The following mounting materials must be provided by customer:
1 Use the centering sleeves (1) from the enclosed pack.
2 Fasten the attachment on the four threaded holes (2).
3 For this, use the 2 counterbores for the centering sleeves (4).
1 The control cam retaining plate must be fixed with the center-
ing sleeves (4)
between the pinion and a customer side mounting plate.
2 Attach the mounting plate via the 4 threaded holes (2).
3 Secure attachment on the mounting plate.
Air connection
WARNING
Risk of injury when the machine/system moves unexpectedly!
Remove the energy supplies.
Make sure that no residual energy remains in the system.
NOTICE
Observe the requirements for the air supply.
• Only open the air connections required.
• Seal air connections not required using
the locking screws from the enclosed pack.
• For hose-free direct connections use the two O-rings from the
enclosed pack.
Pinion mounting
Pinion mounting with
optional inductive
proximity switch
6.2