background image

LaQ07 Laminate Mounting Instructions

GB

1

© Schletter GmbH 

 Gewerbegebiet an der B15 

 Alustraße 1 

 83527 Kirchdorf/Haag i. OB 

 Germany 

 Tel.: +49 8072 9191-200

Fax: +49 8072 9191-9200 

 E-mail: [email protected] 

 www.schletter.eu 

 Updated 04/2012 

 Subject to change without notice

Your  contact  in  the  UK:  Schletter  UK  Limited,  Tel.:  +44  1296  461  800,  Fax:  +44  1296  461  801,  E-mail:  [email protected]

LaQ07 Laminate 

Mounting Instructions

Bearing plate

End clamp

Middle clamp

Safety hook

Safety instructions

Required tools

 

 

Screwdriver with bits:  
Bit hex-head SW6 
Flat wrench / spanner SW15 
 
Corresponding tools 
For the selected fasteners 
 
 
 

The Schletter tool kit comprises    

                    tools required for all standard systems.

 Planning, mounting and start-up of the solar plant must be carried out exclusively by quali

fi

ed specialists. Poor quality execution 

can result in damage to the plant and to the building and can present a risk to people.

Risk of falling! There is a risk of falling when working on the roof as well as when ascending and descending the building. Accident 
prevention regulations must be observed and appropriate safety equipment must be in place.

Risk of injury! Objects falling from the roof can cause injury to people. The danger area around the installation site must be secured 
and people present in the area warned of the risks. 

Risk of breakage! PV modules can be damaged if stepped upon. 

Risk of electric shock! The mounting and maintenance of the PV modules must be carried out exclusively by quali

fi

ed  

specialists. Please observe the all safety regulations issued by the manufacturer!

 

Module bearing pro

fi

le

Distance pieces

Fastener (Fix2000 Standard)

Additional documentation

 

 

Structural analysis  

Analysis print-out with schematic diagram
from the plant calculation 

Summary of Contents for FixZ-15

Page 1: ...when working on the roof as well as when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be used Risk of injury Objects fal...

Page 2: ...4 e 10 e 10 e 10 e 10 e 4 e 4 h a b b a o Mount fasteners t Select corresponding distance be tween fasteners a for the respective module The exact dimensions are displayed for you in the Autokalkula t...

Page 3: ...UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk FixZ 7 Mounting Instructions p Mount system rail t Mount system rail on the fasteners in our example Hook i...

Page 4: ...systems please visit our website www schletter eu under Downloads in the Solar section r Module mounting t Position the first module flush with the end of the rail then observe the inden tation distan...

Page 5: ...when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be used Risk of injury Objects falling from the roof can cause injury...

Page 6: ...one Corner zone Roof center zone Edge zone Edge zone Corner zone Edge zone Corner zone x y e 4 e 4 e 10 e 10 e 10 e 10 e 4 e 4 h a b b a o Mounting the fasteners Select corresponding distance be tween...

Page 7: ...example Hook in to the KlickTop attachment and secure with a 6 Lobe screw T40 q Extending the lower system rail Position next rail Mount the E connector from below Tighten the pre assembled 6 spanner...

Page 8: ...s please visit our website www schletter eu under Downloads in the Solar Mounting section a s Mounting the module Position the first module flush with the end of the rail then observe the indentation...

Page 9: ...as when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be in place Risk of injury Objects falling from the roof can cause...

Page 10: ...kalkulator t Further recommendations are offered in the structural analysis for fasteners The number of fasteners required is also dependent upon the properties of the roof please verify details with...

Page 11: ...act in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk p Mount module bearing profile t Feed square head screws M10x25 into the lower bearing profile an...

Page 12: ...schletter eu under Downloads in the Solar section r Position bearing plate t Place bearing plate in required fastening position s Module mounting t Position first module to the end of profile t Secur...

Page 13: ...lified specialists Poor quality execution can result in damage to the plant and to the building and can present a risk to people Risk of falling There is a risk of falling when working on the roof as...

Page 14: ...okalkulator t Further recommendations are offered in the structural analysis for fasteners The number of fasteners required is also dependent upon the properties of the roof please verify details with...

Page 15: ...tact in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk p Mount module bearing profile t Feed square head screws M10x25 into the lower bearing profile a...

Page 16: ...are nuts t Feed KlickIn click components into the groove at the required positions t Feed square nuts into the click com ponents and twist through 90 so that the rounded edge is underneath s Position...

Page 17: ...Your contact in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk v Module mounting t Guide modules into the clamps For further information relating to o...

Reviews: