Smoke extraction damper ERK-SO
TECHNICAL DOCUMENTATION
Sample of functional test protocol |
Construction subject to change
No
return
possible
Version:
2017-11-28
|
Page
40
SAMPLE OF FUNCTIONAL TEST PROTOCOL
SCHAKO
Ferdinand
Schad
KG
Steigstrasse 25-27
D-78600 Kolbingen
Phone:
+49-
(0)7463
/
980-0
Fax:
+49-
(0)7463
/
980-200
E-mail:
Web:
www.schako.de
SAMPLE
Functional test protocol for smoke extraction dampers
Cons. No. ____________________
Smoke extraction dam-
per No.:
Declaration of perfor-
mance no.:
Series:
Actuator:
The following functional steps have
been carried out according to the
documents installation, mounting
and operating instructions
before
commissioning
next
functional
check in:
_____________
next
functional test
in:
_____________
next
functional test
in:
_____________
next
functional test
in:
_____________
External check:
System: _____________________
Item: _______________________
Internal check:
System: _____________________
Item: _______________________
Additional check:
System: _____________________
Item: _______________________
without defects
Date / tester
with defects (see back)
Date / tester
without defects
Date / tester