Document
9911004rev27
Title
Date
2017-02-16
Page
38(81)
SBS MicroSMART Battery Charger Technical Handbook
10
10.LiFePO4
Lithium iron phosphate. I1 300 % C5, U1 3.65VPC. Ready when
I < 5 % C5.
11
11.FCIUI
As 1.10-06 with I1 40 % C5. Manual equalize 2h + 10 min water
+ 4h. U temp comp 3 mVPC, neutral 30ºC. I temp comp 40º-
65ºC. 3 minutes charging min time.
12
12.FCIU
As 1.10-06 with I1 40 % C5 no I2 phase. Manual equalize I2 +
2h + 10 min water + 4h. U temp comp 3 mVPC, neutral 30ºC. I
temp comp 40º-65ºC. 3 minutes charging min time.
13
13.CFLA-02
As CFLA-01 with min charging time 1 h + 1 min.
16
16.10-05
Free ventilated lead acid. I1 20 % C5, U1 2.4 VPC, I2 5 % C5, U2
2.8 VPC, I3 0.8 % C5, U3 2.26 VPC. Manual Equalize 5 % C5, 2.8
VPC 2 h + 10 min water + 1 h. U temp comp 3 mVPC, neutral
30ºC. I temp comp 45º-60ºC. 2.5 h charging min time.
20
20.23-03
Evolution curve. For detailed information contact Enersys (ref:
CDC-Evo 05).
21
21.10-16
As 16.10-05 with U3 2.8 VPC.
22
22.10-99
As 2.10-04 but with 15 % additional charge.
23
23.OP25-02
As 4.CFLA-01 with I1 25% C5 and 15 second charging min time.
24
24.OP30-02
As 4.CFLA-01 with I1 30% C5 and 15 second charging min time.
25
25.OP35-02
As 4.CFLA-01 with I1 35% C5 and 15 second charging min time.
26
26.OP40-02
As 4.CFLA-01 with I1 40% C5 and 15 second charging min time.
27
27.OP45-01
As 6.OP25-01 with I1 45 % C5.
28
28.10-98
As 16.10-05 but with U2 2.5 VPC, U1 max time = 3h and I2 max
time = 4h.
29
29.FCI25-01
As 23.OP25-02. Only I1 phase unless manual equalize then UI,
I2, EQU is done as well.
30
30.Lion-01
Litium ion. I1 200 % C5. ReguOn = 2.0VPC ReguOff = 4.5 VPC.
31
31.10-97
As 1.10-06 but with 3-minute total min time.
32
32.10-96
As 2.10-04 but with 3-minute total min time.
34
34.SC03-01
Shop charging curve. I1 5%, U1 2.8VPC. Max 3h or 15% then
goto Ready.
35
35.SC06-01
Shop charging curve. I1 5%, U1 2.8VPC. Max 6h or 30% then
goto Ready.