ASSEMBLY INSTRUCTIONS
4 COLUMNS DUPLEX P-150
13
1.8
INSTALLING “U” DRAINING PROFILE, OPENING, CLOSING, CENTRAL AND LATERALS
Check that all the “U” profile holes match
the M6 pre-drilled ones on the beam.
If all of them match, apply the sealant
between the “U” profile and the beam
after screwing the profiles with the ULS
(ISO 7380) A2x16 screws.
Use the sealant provided to seal the “U”
profiles to the beams and the joints that
could suffer water leaks.
Install the “U” draining profile on the
LEFT and RIGHT beams. To do it, in-
sert the profile end through the drain-
ing hole pre-drilled on columns A and
B and leave it flush with the beam and
columns C and D.
Mount the U-shaped grooves on the
central beam, flush with the opening
and closing beams, just as you did with
the U-shaped drain grooves 62x65x2,5
along the opening beam, inserting the
A and B column ends into the closing
beam, flush with the C and D columns.
SEALANT
SCREW ULS
(ISO 7380) A2 M6x16
Code 051103
“U” 62x65x2,5
Code 050155
“U” 60x48
Code 008830