![Sapling SDLG Series Installation Manual Download Page 45](http://html1.mh-extra.com/html/sapling/sdlg-series/sdlg-series_installation-manual_1198747045.webp)
45
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation
14) Attach the power wires to the port as
shown below.
24VAC/DC (Orange)
24VAC/DC (Yellow)
110/230VAC (Black)
110/230VAC (White)
1
2
3
4
5
Ground (Green)
15) Use the 6-19x1/2 screws to attach a display
board to each housing.
NOTE:
For 2.5” Digit clocks, the holes for the
screws will be on the left and right inner surfaces of
the housing. For 4.0” Digit Clocks, the holes will be
on the top and bottom surfaces.
16) Remove the plastic cover from each display board.
17) Place a filter over each display board. You should
hear a snapping noise as the latches drop into place.