
32
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation
Description
SDLG Digital Clock
Digital Clock Wall Housing
6-19x1/2 screw
6-32x1 screw
Quantity
1
1
4
4
Picture
Included in Package
Included in Pole Kit (SAB-1BD-00S-0)
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
Continued on next page
Dual-mount pole, including
mounting plate
#10-32x3/8 green screw
#8-32x7/16 screw
1
1
8
VERY IMPORTANT:
CONFIGURE THE MESSAGE DISPLAY BEFORE MOUNTING THE DISPLAY TO A WALL OR CEILING
A Sapling Master Clock and any Repeaters must be installed, powered, and set up
BEFORE
you attempt to set up a wireless clock system. If the Master
Clock and Repeaters are not properly installed and powered, the secondary clocks will not synchronize.