
27
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
3) Attach the power wires from your kit to the
power wires in the gang box.
Wall Mount Installation
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of three inches away
from the ceiling.
4) If you do not wish to attach the housing to the
gang box, proceed to step 5A. Otherwise, go to
step 6.
Ceiling
4” Minimum
2) Run power wiring to the gang box.
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 110
volt model, 207-253 volts AC in the 230 volt
model, or Yellow & orange wires for 21.5-26.5
volts AC in the 24 volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.