
Maintenance Procedures
SY75C Excavator OMM
5-66
Operation and Maintenance Manual — 0220
SANY
4. Press hydraulic tank vent button (b) to relieve pressure
in the tank.
5. Reinstall butterfly nut (a).
6. Remove hydraulic return filter cover (c).
7. Remove spring (d), then withdraw filter (e).
8. Check the bottom of the return filter housing and
remove any debris.
9. Install a new filter in the return filter housing.
CAUTION!
Hydraulic oil may be hot and under pressure.
Always use caution when opening the hydraulic
system.
Fig. 5-103
b
Fig. 5-104
c
Fig. 5-105
e
d
Summary of Contents for SY75
Page 2: ......