
Operation
Safety, Operation and Maintenance Manual - Sep 2012
4-60
SY115C9/135C/155H Crawler Hydraulic Excavator
5. If the machine is installed with work equip-
ment, the work equipment must be placed
in front of the machine. Move the machine
straight forward up the ramp. Without the
work equipment, reverse the machine up
the ramp.
Lower the bucket on the trailer to sup-
port the machine immediately after getting
aboard.
Instruction and signals from a commander
must be followed, in especially reverse
travel.
6. Align your machine with the ramp before
driving up the ramp. The centerline of ma-
chine shall match the centerline of trailer.
Align your machine with the ramp and trav-
el slowly.
Lower the work equipment as low as pos-
sible if it causes no trouble.
On an access ramp, only the travel lever
can be maneuvered. Never maneuver any
other control levers.
7. Drive the machine slowly forward till all
tracks are on the trailer and have full
contact with trailer
fl
oor.
8. When the machine passes the rear wheels
of the trailer, the machine could lean
forward. So drive the machine slowly and
carefully in order to avoid impact with the
trailer.
9. Slightly raise the bucket, retract the arm
and maintain it in lower position, and slowly
swing the upper structure by 180°.
90°-110°
CZ335-1103231
CZ335-1103232
CZ335-1103233
Fig. 4-101
Fig. 4-102
Fig. 4-103