
System Functions
Safety, Operation and Maintenance Manual - Aug 2012
3-81
SY115C9/135C/155H Crawler Hydraulic Excavator
Fuse capacity and corresponding circuit
No.
Capacity
Circuit
F1
20A
Start circuit
F2
10A
Charging indicator
F3
5A
Horn circuit
F4
15A
Work lamp
F5
5A
Wiper & washer
F6
10A
Radio
F7
10A
Cab lamp
F8
20A
Air conditioner
F9
5A
Access lamp
F10
5A
Monitor
F11
15A
Controller
F13
15A
Head lamp
F14
10A
GPS
F15
15A
Cigar lighter
10
15
15
15
5
20
5
5
5
10
10
10
15
20
F2
F4
F5
F6
F8
F10
F11
F13
F1
F3
F7
F9
F14
F15
CZ135B-1103013
Fig. 3-134
Table 3-8
3.19 Fusible Link
The fusible link (1) could possibly fail if the
starter motor does not work with the start
switch in ON position. Open the fuse compart-
ment cover to access the fusible link on the
back side of the seat in order to check and re-
place it.
Remark
:
The fusible link is the large-size fuse applied
to high current circuit in order to protect elec-
trical component and wire from burning, in the
way operating as a common fuse.
1
CZ335-1103118
Fig. 3-135