V21 Parts & Service Manual
All V21 Identified Equipment
REV A – 10/2013
P/N: 1230247
V21
General Information | G-14
VEND CYCLE
Several operations take place during the vend cycle: When a selection is made, the coupler and
bucket rotate, product is dispensed and the bucket is then reloaded. The sequence of these
operations changes slightly when the column’s depth setting is changed. With the single depth
setting, one purchase is made and the bucket is reloaded. With the double depth setting, two
purchases are made before the bucket is reloaded. With the triple depth setting, three purchases
are made before the bucket is reloaded. With the quadruple depth setting, four purchases are
made before the bucket is reloaded. (See Figures 8 & 9)