S&C Instruction Sheet 1042-511
7
Installation
Figure 1. Suggested team installation and setup procedure, Phase 1.
Team Installation/Setup
Phase 1
Assign each team member a unique
DNP/RTU address .
START
Go to Phase 2
(see next page)
Plan the layout of the sources,
switches, and the line sections
that will be part of the
IntelliTeam II system .
Plan the communication system
for peer-to-peer transmission
and for data interchange with
the SCADA master station,
if one is used .
Name the teams (16 characters
maximum) . Assign team number
designations: Team 1 to 8
as needed for the
Setup>
Team Configuration
screens .
Inspect the received equipment for
damaged or missing parts .
Order necessary comm equipment .
Collect the information needed
to set up communication equipment
and team member software .
Summary of Contents for 5800 Series
Page 27: ...S C Instruction Sheet 1042 511 27 Installation Diagrams...
Page 28: ...28 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 29: ...S C Instruction Sheet 1042 511 29 Installation Diagrams...
Page 30: ...30 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 31: ...S C Instruction Sheet 1042 511 31 Installation Diagrams...
Page 32: ...32 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 33: ...S C Instruction Sheet 1042 511 33 Installation Diagrams...
Page 34: ...34 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 35: ...S C Instruction Sheet 1042 511 35 Installation Diagrams...
Page 36: ...36 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 37: ...S C Instruction Sheet 1042 511 37 Installation Diagrams...
Page 38: ...38 S C Instruction Sheet 1042 511 Installation Diagrams...