18
S&C Instruction Sheet 1042-511
Installation
Figure 8. Side view of the switch control enclosure on the pole.
(b) Pad-mounted controls:
Mount the switch control chassis in the low-voltage compartment as follows:
1. Find the four studs on the wall of the low-voltage compartment.
2. Position the switch control so the four studs align with the four holes in the
mounting flanges. See Figure 9.
3. Hang the switch control on the studs.
4. Secure the switch control with lock washers and nuts.
Figure 9. Switch control chassis mounted in pad-mounted gear.
Summary of Contents for 5800 Series
Page 27: ...S C Instruction Sheet 1042 511 27 Installation Diagrams...
Page 28: ...28 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 29: ...S C Instruction Sheet 1042 511 29 Installation Diagrams...
Page 30: ...30 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 31: ...S C Instruction Sheet 1042 511 31 Installation Diagrams...
Page 32: ...32 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 33: ...S C Instruction Sheet 1042 511 33 Installation Diagrams...
Page 34: ...34 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 35: ...S C Instruction Sheet 1042 511 35 Installation Diagrams...
Page 36: ...36 S C Instruction Sheet 1042 511 Installation Diagrams...
Page 37: ...S C Instruction Sheet 1042 511 37 Installation Diagrams...
Page 38: ...38 S C Instruction Sheet 1042 511 Installation Diagrams...