Samsung Electronics
14-7 Installation Diagram of Indoor Unit and Outdoor Unit
14-7-1 Air-Purge Procedure
1) Connect each assembly pipe to the appropriate
valve on the outdoor unit and tighten the flare nut.
3) Open the valve of the low pressure side of
manifold gauge counter-clockwise.
4) Purge the air from the system using vacuum pump
for about 30 minutes.
– Make sure that pressure gauge show
-0.1MPa(-76cmHg) after about 30 minutes.
– This procedure is very important in order to avoid
gas leak.
– Turn off the vacuum pump.
– Close the valve of the low pressure side of
manifold gauge clockwise.
– Remove the hose of the low pressure side
of manifold gauge.
7) Check for gas leakage.
- At this time, especially check for gas leakage from
the 3 way valve’s stem nuts, and from the service
port cap.
2) Connect the charging hose of low pressure side of
manifold gauge to the packed valve having a ser-
vice port as shown at the figure.
5) Set valve cork of both liquid side and gas side of
packed valve to the open position.
6) Mount the valve stem nuts and the service port cap
to the valve, and tighten them at the torque of
183kgf•cm with a torque wrench.
A
B
C
D
Outdoor unit
Indoor unit
Gas pipe side
Liquid pipe side
Vacuum Pump
A
(
gas
)
B
(
liquid)
Valve stem
Stem cap
14-8
Summary of Contents for CH070EAMC
Page 34: ...Samsung Electronics 5 2 Panel 5 4...
Page 44: ...Samsung Electronics 5 4 Ass y Control In CH140EAMC DB93 04137A 5 14...
Page 46: ...Samsung Electronics CH105EAMC DB93 04376A Exploded Views and Parts List 5 16...
Page 48: ...Samsung Electronics CH052 070 094EAMC DB93 05254A Exploded Views and Parts List 5 18...
Page 54: ...Samsung Electronics UH052 070EAMC DB93 04731B DB98 04731A Exploded Views and Parts List 5 24...
Page 76: ...Samsung Electronics 7 8 MEMO...
Page 89: ...Samsung Electronics 10 8 MEMO...
Page 125: ...Samsung Electronics 14 10 MEMO...