Attention
Do not use terminals of different manufacturers or of
different types, other than those included in the acces-
sory pack. SALICRU shall not be held liable for any form
of damage caused by the use of unauthorised terminals.
Attention
Moisture and dust can damage the inverter; check that
the cable gland is tight enough during installation.
The warranty will be void if the inverter is damaged as
a result of an improperly installed cable gland.
5.3.1. Wiring diagram.
This diagram shows the structure and composition of the wiring of
hybrid inverters in the
EQX2-HSX
series, in relation to the actual
project. The installation and wiring must comply with local stand-
ards.
Fus.
Fus.
Fus.
SPD
SPD
SPD
IGA
ICP
Meter
ID
ID
ID
MCB
Inverter
MCB
MCB
CT
PIAs
PIAs
Back-up
PV
Batt.
BM
S
M
et
er
Legend abbreviations:
IPC
– Power control switch.
IGA
– Main circuit breaker.
ID
– Differential switch.
MCB
– Magnetic Circuit Breaker.
Fus.
– Fuses.
SPD
– Surge Protection Device.
PIA
– Small circuit breaker.
PV
– Photovoltaic panel.
Batt
. – Batteries.
BMS
– Communication system with the Battery
Management System.
Meter
– Communication system with the Meter.
Fig. 35. Standard wiring diagram.