INCANTO 04 OPERATING LOGIC
8/10
4.6. Coffee cycle
Notes: * Only with Pre-brewing
Switching on
When the machine is switched on, the gear motor repositions itself as follows:
- It acts on microswitch 1 (see following chapter).
- The gear motor changes its rotation direction and moves upwards again by approx. 1-2 mm.
- The boiler begins to heat the water for approx. 45 sec., at full power, in order to reach the
optimal temperature. The temperature will then remain at a constant level.
Coffee cycle
1.
The coffee grinder starts the grinding process (controlled by Time).
2.
The gear motor (brewing unit) moves to the brewing position.
3.
Preliminary dispensing phase (short pump activity, short pause).
4.
Product dispensing (the pump operation period is defined by the amount of product dis
-
pensed).
5.
The gear motor moves to its home position (the dregs are expelled automatically).
Main switch ON
START
STOP
Time
Coffee grinder
Heating
Pump
Brewing unit gear
motor
Status
Heating
Ready
Coffee cycle
Time
(Dosage)
Pump operation (flow
meter pulses) in
accordance with the
amount of product
selected.
approx.
45 sec.
*
Single microswitch gear motor
Status
Microswitch
OFF
ON
Summary of Contents for OTC SERIES
Page 3: ...INCANTO CHAPTER 1 INTRODUCTION...
Page 11: ...INCANTO CHAPTER 2 TECHNICAL SPECIFICATIONS...
Page 18: ...INCANTO CHAPTER 3 BRIEF INSTRUCTIONS...
Page 22: ...INCANTO CHAPTER 4 OPERATING LOGIC...
Page 33: ...INCANTO CHAPTER 5 SERVICE MODE...
Page 44: ...INCANTO CHAPTER 6 SERVICE AND MAINTENANCE...
Page 47: ...INCANTO CHAPTER 7 DISASSEMBLY...
Page 57: ...INCANTO CHAPTER 8 NOTES...
Page 58: ...INCANTO 08 NOTES 1 1...
Page 59: ...INCANTO CHAPTER 9 WATER CIRCUIT DIAGRAM...