INTELIA 02 TECHNICAL SPECIFICATIONS
Saeco International Group
Rev. 02 / September 2012
Page / 03
2.1.
Technical
speci
fi
cations
Power supply and output:
240 V~ 50 Hz 1850 W - 230 V~ 50/60 Hz 1850 W
Temperature monitoring:
(NTC) variable resistor sensor - transmits the value to the
electronic card
Safety system:
2 thermostats at 190°C
one shot
Coffee heat exchanger output:
Stainless steel
(230 V~) 1900 W
for coffee, hot water and steam dispensing
Steam heat exchanger output:
Stainless steel
As above
Gear motor:
2 rotation directions; power supply 24VC
Pump:
Ulka Type EP5/S GW approx. 13-15 bar with reciprocating
piston and thermal switch 100°C 48 W, 230V, 50 Hz, 120V,
60Hz 100V, 50/60 Hz
Overpressure valve:
Opening at approx. 16-18 bar
Water
fi
lter:
In tank
Coffee grinder:
Direct current motor with
fl
at ceramic grinder blades
Automatic dosage:
Dose adjustment controlled by the electronic system
Power consumption:
During heating phase- approx. 5.6 A
Dimensions: W x H x D in mm:
256x340x440
Weight:
9 kg
Water tank capacity:
1.5 l
Coffee bean hopper capacity:
300 g. of coffee beans
Dreg drawer capacity:
10
Heat exchanger capacity:
10 (11 if after 9 dregs you dispense a double espresso)
Water circuit
fi
lling time:
Approx. 15 sec Max. on
fi
rst
fi
lling cycle
Heating time:
Approx. 45 sec.
Grinding time:
Approx. 8-10 sec.
01
Temperature the products in cup
The acceptance limits are divided by features and products and are the following:
Espresso coffee Italy 25/40 grTemperature of 1st product
≥
69°C
≤
85°C
Temperature of 2nd product
≥
72°C
≤
85°C
Coffee 70/120 grTemperature of 1st product
≥
69°C
≤
85°C
Temperature of 2nd product
≥
72°C
≤
85°C
Summary of Contents for Intelia
Page 3: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 1 INTRODUCTION...
Page 9: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 2 TECHNICAL SPECIFICATIONS...
Page 13: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 3 USER INSTRUCTIONS...
Page 24: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 4 OPERATING LOGIC...
Page 33: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 5 TROUBLESHOOTING...
Page 56: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 6 STANDARD CHECKS...
Page 59: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 7 DISASSEMBLY...
Page 71: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 8 NOTES...
Page 72: ...INTELIA 08 NOTES Saeco International Group Rev 02 September 2012 Page 01 01...
Page 73: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 9 WATER CIRCUIT DIAGRAM...
Page 76: ...Saeco International Group Rev 02 September 2012 INTELIA CHAPTER 10 ELECTRICAL DIAGRAM...