GAGGIA VELASCA 04 OPERATING LOGIC
2/7
4.2. Coffee cycle
Notes: * Only with Pre-brewing
Switching on
When the machine is switched on, the gear motor repositions itself as follows:
- It acts on microswitch 1 (see following chapter).
- The gear motor changes its rotation direction and moves upwards again by approx. 1-2 mm.
- The boiler begins to heat the water for approx. 45 sec., at full power, in order to reach the
optimal temperature. The temperature will then remain at a constant level.
Coffee cycle
1.
The coffee grinder starts the grinding process (controlled by pulses generated by a sensor).
2.
The gear motor (brewing unit) moves to the brewing position.
3.
Preliminary dispensing phase (short pump activity, short pause).
4.
Product dispensing (the pump operation period is defined by the amount of product dis
-
pensed).
5. The gear motor moves to its home position (the dregs are expelled automatically).
Main switch ON
START
STOP
Time
Coffee grinder
Heating
Pump
Brewing unit gear
motor
Status
Heating
Ready
Coffee cycle
Pulses
(Dosage)
Pump operation (flow
meter pulses) in
accordance with the
amount of product
selected.
approx.
45 sec.
*
Single microswitch gear motor
Status
Microswitch
OFF
ON
Summary of Contents for GAGGIA VELASCA CMF-OTC
Page 3: ...GAGGIA VELASCA CHAPTER 1 INTRODUCTION...
Page 10: ...GAGGIA VELASCA CHAPTER 2 TECHNICAL SPECIFICATIONS...
Page 16: ...GAGGIA VELASCA CHAPTER 3 BRIEF INSTRUCTIONS...
Page 23: ...GAGGIA VELASCA CHAPTER 4 OPERATING LOGIC...
Page 31: ...GAGGIA VELASCA CHAPTER 5 SERVICE MODE...
Page 40: ...GAGGIA VELASCA CHAPTER 6 SERVICING AND MAINTENANCE...
Page 43: ...GAGGIA VELASCA CHAPTER 7 DISASSEMBLY...
Page 50: ...GAGGIA VELASCA CHAPTER 8 NOTES...
Page 51: ...GAGGIA VELASCA 08 NOTES 1 1...
Page 52: ...GAGGIA VELASCA CHAPTER 9 WATER CIRCUIT DIAGRAM...
Page 54: ...GAGGIA VELASCA CHAPTER 10 ELECTRICAL DIAGRAM...
Page 55: ...GAGGIA VELASCA 10 ELECTRICAL DIAGRAM 1 1 10 1 Electrical diagram...