background image

12

240V CIRCUIT  

BREAKER

240VAC 

PUMP

GROUND

P U M P   C O N N E C T I O N S

NOTE:

  

This model is factory equipped for a Single Speed pump only. 

C o n n e c t i n g   A   2 4 0 V A C   P u m p :

Connect a 240V 30AMP Circuit Breaker for each pump (if this control box is equipped with optional pump 

relays).  
Using an appropriately sized copper wires connect to the outer 

contacts of the JQX relays of the appropriate pumps as shown.  
Run wires from the pump to the inner contacts of the appropriate 

JQX relay.

NOTE: 

 This unit maybe equipped with more than one JQX relay 

                  for pump control 

Summary of Contents for WPC2 T Series

Page 1: ...AC 60Hz applications Installation Instructions Read these instructions in their entirety before performing any installation work FOR USE WITH POOL AND SPA PRODUCTS 4008814 ETL LISTED Conforms to UL ST...

Page 2: ...2...

Page 3: ...RING INSTRUCTIONS 7 Power Connections 7 Hooking up Low Voltage Lights to Circuit 1 8 Hooking up Low Voltage Lights to Circuit 2 9 Wiring Diagram 10 EXTERNAL MAGNETIC ANTENNA MOUNTING 11 PUMP CONNECTIO...

Page 4: ...Relay 3 1 94 15264 00 WPC Receiver 2 circuit 4 1 94 15263 00 Remote Control 2 circuit Transmitter 5 1 PLX ANTKT S 3 meter magnetic mount antenna Kit 6 1 44 15037 00 Transformer 12V OPTIONAL ACCESSORY...

Page 5: ...s Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause un...

Page 6: ...rque Max Motor Load Continuous Duty General Purpose Branch Circuit Breaker Rating General Purpose Branch Circuit Maximum Current Capacity Line and Neutral Main Lugs Neutral and Ground 120V 240V AWG AM...

Page 7: ...To make power connections remove 3 8 inches of insulation from wire ends Connect bare wires to the Load Center as illustrated T ighten terminal screws firmly 20 lb in minimum Connect the common to the...

Page 8: ...tion to store service loop cable Use appropriate wire from the separate 12VAC output block terminals L1 L2 to supply Low Voltage power from the WPC2 XXXX T to the approved Pull Junction or Bell Box Us...

Page 9: ...WPC 2 As illustrated connect lights that will be operated by the Circuit 2 Switch to the Circuit 2 terminal Connect the Neutral to the Terminal Block marked Neutral Connect the Ground to the Equip GND...

Page 10: ...AL NEUTRAL CIRCUIT 2 12 VAC 12 VAC TC POWER TC NEUTRAL BK CIRCUIT 1 FOR USE ON WPC AUXILIARY RELAY KIT FOR TEMPERATURE FREEZE PROTECT SWITCH OPTION BK R BR BK 6 7 5 3 BK BR W R 1 2 8 4 6 9 5 8 4 7 3 2...

Page 11: ...less NOTE The remote function of this device operates through radio frequency RF signals As with any RF device this is subject to interference through surroundings and installation location In the ev...

Page 12: ...nnect a 240V 30AMP Circuit Breaker for each pump if this control box is equipped with optional pump relays Using an appropriately sized copper wires connect to the outer contacts of the JQX relays of...

Page 13: ...he Timer function switch is set to Auto for timer control of the Pump as illustrated below To turn off timers automatic functions set the Timer function switch to OFF To manually turn on the Pump set...

Page 14: ...OFF position NOTE If a toggle switch is in the OFF position wireless remote operation of the device will be disabled To re enable wireless remote operation flip the toggle switch back to the REMOTE po...

Page 15: ...HANGE to toggle on and off the power of Zone 2 on the WPC panel Color Changing Operation To change LED pool light colors simply toggle the power OFF then ON using the button marked 1 or 2 within 1 sec...

Page 16: ...C P O Box 400 Canby OR 97013 P 503 266 2231 TF 800 824 4387 srsmith com 2019 S R Smith All rights reserved 79 15224 00 REV C Questions Contact One of Our Dedicated Lighting Specialists 1 800 824 4387...

Reviews: