MAINTENANCE SCHEDULE
Inspect before
each use
Every
25
hours
Every
50 hours
or yearly
Before
storage
Once a month
during storage
Check the brake operation.
x
Check the tyre pressure.
x
Check the side discharge chute and
operator presence safety interlock
systems.
x
Check for loose fasteners.
x
x
Remove all foreign materials from the
product.
x
x
Check/Replace the mulching blades.
x
x
Clean the battery terminals.
x
Check and charge the battery.
x
x
NOTE:
Maintenance should be performed more frequently when the product is used in dusty areas.
When the product has exceeded the maximum figures specified in the table, maintenance should still be cycled according to the intervals of
time or hours stated herein.
If you are unsure how to perform any of the maintenance items listed above, have the product serviced by an authorised service centre only.
CHARGER LED INDICATOR
Charger
status
Battery
pack
inserted
Battery
pack
Red LED
Green
LED
Orange
LED
Action
Power on
No
-
On
Off
Off
The charger is connected to the power supply.
Connect to a battery pack or tool to begin charging.
Testing
Yes
Hot
Off
Off
On
Charger begins charging once the battery pack cools
down.
Cold
Off
Off
Charger begins charging once the battery pack
warms up.
Error
Yes
-
Flash
Flash
Off
●
If the status does not change after removing
and reconnecting the charger, charge a
different battery pack or tool.
●
If a different battery pack or tool charges
normally, contact an authorised service centre.
●
If a different battery pack or tool still shows an
error status, replace the charger.
Charging
Yes
-
Off
Flash
Off
The battery pack or tool is charging.
Ready
Yes
-
Off
On
Off
Charging is complete. The LED indicator will turn off
after 10 minutes.
Summary of Contents for R80XZTR54
Page 1: ...FRONT PAGE R80XZTR54...
Page 10: ...10 12 mm 12 mm 12 mm 12 mm 12 mm 12 mm...
Page 11: ...11 x 2 x 2 x 2 x 4 12 mm 13 mm 6 mm...
Page 37: ...37 Storage 7 20221110v1 7 Push down the joystick...
Page 43: ...1 5 P 1 5 1 5...