Operating Instructions Ryeco RMM2010 - CNC
7.0 Activation and startup
1. Connect the multiple socket extension lead
2. Switch on the measurement computer
►►
The measurement computer and Windows operating system start up
3. Log in to Windows using the "User" account
4. Models with M3 measurement software: Click on the "M3" icon on the desktop to start M3
►►
The M3 measurement software opens
6. Log in as the "Super User" (password: superuser) or "User" (no password required) and click on
"Complete"
►►
A reference run must be completed (see below)
7.1 Completing a reference run (models with M3)
NOTICE
Every time the computer is restarted and every time the power supply is interrupted, the M3 measurement
software automatically indicates that a reference run must be completed. This reference run is mandatory
and cannot be skipped.
7.1.1 Manual models
1. The following notification windows are displayed successively indicating that a reference run is necessary
and providing the relevant instructions:
2. Complete the reference run by moving the measurement table along the X- and Y-axis using the
handwheel and the camera lens along the Z-axis using the handhweel.
►►
The M3 measurement software is available following the reference run.
7.1.2 CNC models
1. An input window indicating that a reference run is required appears:
2. Check that the Emergency Stop button on the joystick is unlocked.
3. Acknowledge the input window by pressing the "Start" button.
►►
The reference run is completed automatically.
►►
The M3 measurement software is available following the reference run.
7.2 Completing a measurement
NOTICE
The measurement object must be free of any impurities and must not wobble or move when the
measurement table is moved, as the measurement result will otherwise be distorted.
1. Position measurement object or sample workpiece on the glass plate.
2. Secure measurement object, if necessary.
3. Ensure that the edge of the workpiece is in focus on the screen; move the Z-axis for this purpose.
Generally, the upper edge of the workpiece should be in focus.
4. The measurement can now be started.
Summary of Contents for Ryeco RMM2010-CNC
Page 11: ...Operating Instructions Ryeco RMM2010 CNC M3 ...
Page 17: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 21: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 23: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 24: ...Operating Instructions Ryeco RMM2010 CNC www ryfag ch ...