Operating Instructions Ryeco RMM2010 - CNC
3.2.1 Trained personnel
Within the context of this documentation, trained personnel have attended training provided by the
operator relating to the assigned work and have been instructed about possible dangers resulting
from improper behavior.
3.2.2 Specialized staff
Within the context of this documentation, specialized staff is individuals who, based on their
technical training, knowledge and experience and their awareness of the relevant regulations, are
able to:
• Safely carry out the work assigned to them and correctly assess the scope of the work
• Independently recognize possible hazards and implement the necessary measures to eliminate
them
• Have adequate language skills to understand these instructions in English.
3.2.3 Electrician
Electricians are individuals, who based on their technical training, knowledge and experience and
their awareness of the relevant standards and regulations are able to complete work on electrical
systems and independently recognize and prevent possible hazards.
3.3 Qualifications required based on the life cycle of the measurement device
WORK QUALIFICATION REQUIRED BY THE PERSONNEL
Transporting the measurement device: Specialized staff for handling the hoisting and transport
equipment. Experience of transporting heavy and bulky goods.
Assembling the measurement device: Specialized staff with relevant vocational training.
Experience of assembling similar measurement devices.
Initial commissioning: Initial commissioning must be carried out by specialized staff at Ryf.
Operating the measurement device: Trained person with relevant specialist knowledge.
Instructions on operating the measurement device.
Maintaining the measurement device: Trained personnel
• Must have received training for the relevant task
• Must have specialist knowledge about measurement devices to complete maintenance
• Must be aware of the dangers of handling measurement devices
Servicing the measurement device: Specialized staff with relevant vocational training. Experience
of servicing similar measurement devices.
Decommissioning the measurement device: Specialized staff for handling the hoisting and
transport equipment. Experience of transporting heavy and bulky goods. Knowledge
of the applicable regulations relating to environmental protection and the disposal of operating
materials at the site.
3.4 Safety and monitoring equipment
The safety and monitoring equipment is designed to protect against personnel injuries and
material damage.
Measurement devices may only be operated when all of the safety and monitoring equipment
is present and fully functional.
Once part of the safety or monitoring equipment has been triggered, the measurement device
may only be placed back into operation once the cause of the fault has been eliminated.
Safety or monitoring equipment may only be removed, changed, disabled or bypassed by qualified
specialized staff as part of temporary interventions during testing, investigations, troubleshooting,
the elimination of damage or faults, and when replacing components. In addition,
these interventions must be safety-related or adequate safety-related contingency measures
must have been implemented.
Summary of Contents for Ryeco RMM2010-CNC
Page 11: ...Operating Instructions Ryeco RMM2010 CNC M3 ...
Page 17: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 21: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 23: ...Operating Instructions Ryeco RMM2010 CNC ...
Page 24: ...Operating Instructions Ryeco RMM2010 CNC www ryfag ch ...