
Installation
20
Runco LS-HB/LS-HB Ultra Installation/Operation Manual
PRE
L
IMINAR
Y
Vertical Len
s
S
hift — L
S
-HB Ultra: The L
S
-HB Ultra provide
s
up to 25% of
upward vertical len
s
s
hift and up to 35% of downward vertical len
s
s
hift.
For
example, with a 100 x 56 inch (1.78:1) screen, you can shift the image up to 14.00 inches
(0.36 meters) above or 19.60 inches (0.50 meters) below the screen center.
Folded Optics
In rear-screen applications where space behind the projector is limited, a mirror may be
used to fold the optical path, as shown in Figure 3-5. The position of the projector and
mirror must be accurately set. If you are considering this type of installation, contact your
dealer for assistance.
Figure 3-5. Folded Optic
s
Other Considerations
Other considerations and tips that can help improve your installation:
• Keep the ambient temperature constant and below 35°C (95°F). Keep the projector
away from heating and/or air conditioning vents. Changes in temperature may cause
drifts in the projector circuitry, which may affect performance.
• Keep the projector away from devices that radiate electromagnetic energy such as
motors and transformers. Common sources of these include slide projectors,
speakers, power amplifiers and elevators.
1. With no vertical lens shift, the lens center and screen center are
aligned with each other.
2. Vertical shift limits are percentages of the screen height.
3.
Vertical lens shift figures are for ceiling mount
configurations.
For floor installations (where the projector is
upright), reverse the up/down vertical lens shift percentages.
Note
➤
For best performance, always use “first-surface” mirrors in your
rear-projection installation (as opposed to conventional,
“second-surface” mirrors with the reflective surface behind a transparent
substrate such as glass or acrylic).
First-surface mirrors provide a strict reflection without the “ghosting”
effect seen with a second surface mirror, where a faint secondary
reflection could be observed coming from the front surface of the glass.
Screen
Mirror
Tip
➤
Summary of Contents for LIGHTSTYLE LS-HB
Page 1: ...LS HB LS HB Ultra High Brightness Full HD Home Theater Projector INSTALLATION OPERATION MANUAL...
Page 2: ......
Page 10: ...x Runco LS HB LS HB Ultra Installation Operation Manual P R E L I M I N A R Y Notes...
Page 111: ......
Page 112: ...Runco International 800 23RUNCO Fax 503 748 8161 www runco com 020 1093 01 Rev A October 2011...