
Controls and Functions
Runco LS-HB/LS-HB Ultra Installation/Operation Manual
5
PRE
L
IMINAR
Y
2.1
LS-HB at a Glance
Figure 2-1 and Figure 2-2 show the key LS-HB components.
Figure 2-1. L
S
-HB Front/
S
ide View
•
TOP IR
S
EN
S
OR
Receives infrared signals from the remote control unit.
•
POWER BUTTON/
S
TATU
S
LED
Indicates projector status as follows:
• Solid green = AC power present, ready to turn on (lamp not lit)
• Flashing green = lamp is warming up or cooling down; keypad functions not allowed
• Off = Lamp lit, projector functioning normally
• Alternating green/red = Lamp problem (door open, unable to strike, end of life), user
intervention likely to fix problem
• Flashing red = Over temperature, user intervention (clear vents, turn on AC) may fix
problem
• Solid red = Error that requires servicing (fan fail, Power-on self-test fail etc.)
•
EXHAU
S
T VENT
Warm air exits the projector through this vent. Ensure that it is not blocked.
•
FOCU
S
RING
Rotate this to focus the projected image.
2. Control
s
and Function
s
S
y
s
tem
K
eypad
Inta
k
e
Vent
Front
IR
S
en
s
or
Top IR
S
en
s
or
Power Button/
S
tatu
s
LED
Exhau
s
t Vent
(on
s
ide)
Focu
s
Ring
Projection Len
s
Zoom Ring
Summary of Contents for LIGHTSTYLE LS-HB
Page 1: ...LS HB LS HB Ultra High Brightness Full HD Home Theater Projector INSTALLATION OPERATION MANUAL...
Page 2: ......
Page 10: ...x Runco LS HB LS HB Ultra Installation Operation Manual P R E L I M I N A R Y Notes...
Page 111: ......
Page 112: ...Runco International 800 23RUNCO Fax 503 748 8161 www runco com 020 1093 01 Rev A October 2011...