Running the Setup Wizard and Logging On to the Web Interface
Step 5: Verify the Settings
SmartCell Gateway 200 Getting Started Guide for SmartZone 3.4, 800-71126-001 Rev A
53
Step 5: Verify the Settings
Verify that all the settings displayed on the
Confirmation
page are correct. If they
are all correct, click
Finish
to apply the settings and activate the SCG on the
network.
Figure 28. Verify that the settings displayed on the Confirmation page are correct
NOTE:
If you find an incorrect setting, click the
Back
button until you reach the
related page, and then edit the settings. When you finish editing the settings, click
the
Next
button until you reach the
Confirmation
page again.
A progress bar appears and displays the progress of applying the settings, starting
the SCG services, and activating the SCG on the network.
When the process is complete, the progress bar shows the message
100% Done
.
The page also shows the IP address through which you can access the SCG web
interface to manage the controller.
Congratulations! You have completed the Setup Wizard. You are now ready to log
on to the controller’s web interface.