d)
e)
Feed the gnav control line down through
the gooseneck block.
Feed the gnav control line through the cleat below the boom. Tie
knot #3
in
the end of the rope
TOP TIP
You can keep the boom up by
hoisting with the mainsheet at
the rear of the boom.
4.1 - Rigging the Gnav
Make sure purchase is extended fully when sail is up.
Summary of Contents for Venture S
Page 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Page 24: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 45: ...Rigging Guide 8 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 48: ...Rigging Guide 9 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 50: ...Rigging Guide 10 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 54: ...Rigging Guide 11 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 57: ...Rigging Guide 12 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 61: ...Rigging Guide 14 Glossary ...