6.3 - Rigging the Gennaker Halyard / Downhaul
You should currently have both ends of the gennaker
halyard/downhaul tied somewhere at the base of the mast.
Untie the end which emerges from the front of the mast
near the mast foot.
a)
b)
Pass the end of the gennaker halyard through the floating block on the end of the
launch line.
The launch is already attached to the boat - It exits the side of the bowsprit (near
the inboard end, goes forward to a block at the bow (under the foredeck) and
terminates at a ‘floating’ block.
Pass the tail of the gennaker halyard aft from the floating block and through the
fairlead on the starboard side of the mast (near the mast foot).
c)
Summary of Contents for Venture S
Page 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Page 24: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 45: ...Rigging Guide 8 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 48: ...Rigging Guide 9 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 50: ...Rigging Guide 10 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 54: ...Rigging Guide 11 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 57: ...Rigging Guide 12 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 61: ...Rigging Guide 14 Glossary ...