2.10 - Righting Lines
a)
b)
c)
d)
e)
Locate the righting lines and righting line elastics in the rope pack.
Tie
knot #4
in one end of the elastic.
There are two holes in the transom flange just below where
the mainsheet bridle elastic passes through the gunwhale.
Pass the righting line elastic through the lower of these
holes in an inboard direction, then back out through the
upper hole.
Tie
knot #3
in one end of the righting line.
Pass the other end of the righting line aft through the P-clip which is
located beneath the gunwhale near the shroud U-bolt.
Pass the end of the righting line aft through the next P-clip (which is
located beneath the gunwhale, about 1.25 metres aft from the shroud
U-bolt).
Summary of Contents for Venture S
Page 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Page 24: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 45: ...Rigging Guide 8 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 48: ...Rigging Guide 9 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 50: ...Rigging Guide 10 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 54: ...Rigging Guide 11 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 57: ...Rigging Guide 12 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER ...
Page 61: ...Rigging Guide 14 Glossary ...