2015-2017 5.0L Mustang
Phase 1/2 RHD ROUSHcharger Kit
1316-RHD-AA 12152016
6
800.59.ROUSH
EQUIPMENT AND SUPPLIES REQUIRED
• 1/4" and 3/8" Drive Ratchets with Extensions
• Metric and Standard Socket Sets (short and deep recommended)
• Metric and Standard Wrench Sets
• 3/8" Drive Torque Wrench (7-35 ft-lb range)
• 6" Scale, Tape Measure, or Other Measuring Device
• Assembly Lubricant (White Lithium Grease or Petroleum Jelly)
• Electrical Tape
• Sharp Knife or Razor Blade
• Medium Strength Thread Locker – Loctite
®
242 (blue) or equivalent
• T-20 Torx Bit Screwdriver or Socket
• 5/16" Drill Bits and Drill motor
• Coolant (meeting Factory Ford specifi cation for 2015 Mustang GT)
• 1/2" Drive Ratchet or Breaker Bar
• Short Phillips-head Screwdriver
• 5/8" Fuel Line Removal Tool
• Solder and Soldering Iron
• Heat Gun or Small Torch for Heat Shrink Tubing
• Tie Straps (Zip Ties)
• Trim Pad Tool (for pushpin removal)
• Fender Cover (2)
GLOSSARY OF TERMS
Air Charge Temperature (ACT) Sensor (From the factory, this function is integrated into the MAF sensor. With
this kit, a separate ACT sensor is installed into the intake manifold)
Electronic Throttle Control (ETC)
Mass Air Flow (MAF) Sensor
Powertrain Control Module (a.k.a. ECM, ECU, PCU, EEC)
Positive Crankcase Ventilation (PCV)
Throttle Position Sensor (TPS)
ROUSH Diagnostic Tool (RDT)
Vapor Management Valve, or Evaporative Emissions Canister Purge Valve (EECPV)
Breakout Point – A place in an electrical harness where the wiring for an individual component leaves (breaks
out of) the main harness to attach to an individual component.