2015-2017 5.0L Mustang Phase 1/2 RHD ROUSHcharger Kit
SECTION A – DISASSEMBLY
1316-RHD-AA 12152016
13
800.59.ROUSH
18. Remove the six (6) pushpin retainers on the
cowl trim panel. Lift up the cowl trim panel and
remove the two (2) nuts and fi ve (5) bolts from the
K-brace. Slide the K-brace out from the cowl trim
panel and remove it from the vehicle.
19. Remove the eight (8) bolts holding the HVAC/
battery closeout.
20. Remove the HVAC/battery closeout.
21. Pry up the pushpin securing the induction
resonance tube to the strut tower. Remove
the mounting nut at the base of the induction
resonance tube at the fi rewall (10 mm). Remove
the induction resonance tube from the cowl. The
induction resonance tube will not be reused.