5.6.2 Installation
INFO
Do not bend the cable directly at the connection point.
Timber
1. Carry out drilling and, if necessary, routing for
cable installation on the door leaf.
2. Unscrew the union nut [1].
1
3
2
3. Fit the stainless-steel cover [2] on the switch.
4. Secure the stainless-steel cover with a union nut.
5. Insert the switch [3] into the drill hole and attach it
to the cover on the door leaf.
PVC and aluminium
1. Drill the hole for cable installation on the door leaf.
2. Insert the switch [1] into the drill hole and secure
with a union nut [2].
2
1
Installation
Day / night changeover switch
Installation
56 ·
05 / 2020
·
IMO_438_EN_v3
Roto Safe E Eneo C | CC | CF
Subject to change.