7. Vacuum Drying and Leakage Checking
4. Rain water might penetrate into pipeline during
construction.
Procedures of special vacuum drying are as follows:
1. Vacuum drying for 1 hour.
2. Vacuum damage, filling nitrogen to reach 0.5Kgf/cm
2
.
Because nitrogen is dry gas, vacuum damage could
achieve the effect of vacuum drying, but this method
could not achieve drying thoroughly when there is too
much moisture. Therefore, special attention shall be drawn
to prevent the entering of water and the formation of
condensate water.
3. Vacuum drying again for half an hour.
If the pressure reached -755mmHg, start to pressure
leakage test. If it cannot reached the value, repeat vacuum
damage and vacuum drying again for 1 hour.
4. Leakage test: After the vacuum degree reaches
-755mmHg, stop vacuum drying and keep the pressure for
1 hour. If the indicator of vacuum gauge does not go up,
it is qualified. If going up, it indicates that there is moisture
or leak source.
8. Additional Refrigerant Charge
•
After the vacuum drying process is carried out, the
additional refrigerant charge process need to be
performed.
•
The outdoor unit is factory charged with refrigerant.
The additional refrigerant charge volume is decided
by the diameter and length of the liquid pipe be-
tween indoor and outdoor unit. Refer the following
formula to calculate the charge volume.
Diameter of liquid
pipe (mm(inch))
Formula
R22/
R410A(Throttling
part in the indoor
unit)
6.35(1/4)
V=30(0.32)g/m(oz/ft)×(L-
standard pipe length)
9.52(3/8)
V=65(0.69)g/m(oz/ft)×(L-
standard pipe length)
12.7(1/2)
V=115(1.23)g/m(oz/ft)×(L-
standard pipe length)
R22(Throttling
part in the
outdoor unit)
6.35(1/4)
V=15(0.16)g/m(oz/ft)×(L-
standard pipe length)
9.52(3/8)
V=30(0.32)g/m(oz/ft)×(L-
standard pipe length)
12.7(1/2)
V=60(0.64)g/m(oz/ft)×(L-
standard pipe length)
R410A(Throttling
part in the
outdoor unit)
6.35(1/4)
V=15(0.16)g/m(oz/ft)×(L-
standard pipe length)
9.52(3/8)
V=30(0.32)g/m(oz/ft)×(L-
standard pipe length)
12.7(1/2)
V=65(0.69)g/m(oz/ft)×(L-
standard pipe length)
R32
6.35(1/4)
V=12(0.13)g/m(oz/ft)×(L-
standard pipe length)
9.52(3/8)
V=24(0.26)g/m(oz/ft)×(L-
standard pipe length)
12.7(1/2)
V=40(0.42)g/m(oz/ft)×(L-
standard pipe length)
V:
Additional refrigerant charge volume.
L :
The length of the liquid pipe.
Note:
•
Refrigerant may only be charged after performed
the vacuum drying process.
•
Always use gloves and glasses to protect your hands
and eyes during the charge work.
•
Use electronic scale or fluid infusion apparatus to
weight refrigerant to be recharged. Be sure to avoid
extra refrigerant charged, it may cause liquid ham-
mer of the compressor or protections.
•
Use supplementing flexible pipe to connect refriger-
ant cylinder, pressure gauge and outdoor unit. And
The refrigerant should be charged in liquid state.
Before recharging, The air in the flexible pipe and
manifold gauge should be exhausted.
•
After finished refrigerant recharge process, check
whether there is refrigerant leakage at the connec-
tion joint part.(Using gas leakage detector or soap
water to detect).
Summary of Contents for ANERU Series
Page 2: ......
Page 5: ......
Page 6: ...Contents 1 Precautions 2 2 Information servicing For flammable materials 3 Safety Precautions...
Page 12: ...Contents 1 Model Reference 2 2 External Appearance 3 Model Reference...
Page 15: ...Model Reference 4 2 2 Outdoor Unit Single Fan Outdoor Unit Double Fan Outdoor Unit...
Page 18: ...IDU Console 3 2 Dimensional Drawings 16 Drain pipe Hanging arm 195 700 600 210...
Page 21: ...IDU Console 6 6 Air Velocity and Temperature Distributions Discharge Angle 60...
Page 36: ...IDU Compact Cassette 4 2 Dimensional Drawings...
Page 38: ...IDU Compact Cassette 6 4 Service Place...
Page 56: ......
Page 115: ...IDU Super Slim Casstte 54 36k 42k 48k 55k...
Page 118: ......
Page 131: ...IDU Duct 7 6 Fan Performance 12K...
Page 132: ...IDU Duct 8 18K...
Page 133: ...IDU Duct 9 24K...
Page 134: ...IDU Duct 10 30K 36K...
Page 135: ...IDU Duct 11 42K 48K...
Page 136: ...IDU Duct 12 55K...
Page 165: ...IDU Duct 41 12k 18k 24k 30k...
Page 166: ...IDU Duct 42 36k 42k 48k 55k...
Page 178: ......
Page 179: ...35mm 1 38in...
Page 180: ......
Page 256: ...IDU Floor Ceiling 82 36k 48k 55k...
Page 259: ......
Page 267: ...Outdoor Unit 3 Panel Plate B30...
Page 268: ...Outdoor Unit 4 Panel Plate BA30...
Page 269: ...Outdoor Unit 5 Panel Plate CA30...
Page 270: ...Outdoor Unit 6 Panel Plate D30...
Page 271: ...Outdoor Unit 7 Panel Plate X230...
Page 272: ...Outdoor Unit 8 Panel Plate X330...
Page 273: ...Outdoor Unit 9 Panel Plate X430...
Page 274: ...Outdoor Unit 10 Panel Plate E30...
Page 275: ...Outdoor Unit 11 Panel Plate 590...
Page 276: ...Outdoor Unit 12 2 Service Place...
Page 285: ...Outdoor Unit 21 UO70Xo UO90Xo UO100Xo UO100Xo3F...
Page 286: ...Outdoor Unit 22 UO120Xo UO140Xo UO160Xo...
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ...Outdoor unit printed circuit board diagram 17122000044714 17122000048121 17122000046453...
Page 297: ...Outdoor unit printed circuit board diagram 17122000048064...
Page 299: ...Outdoor unit printed circuit board diagram 17122000047742 1 3 4 6 8 9 5 7 10 12 11 2 13...
Page 302: ...Outdoor unit printed circuit board diagram 17122000041841...
Page 304: ...Outdoor unit DC motor driver board diagram 17122000021912 5 6 1 2 3 4...
Page 320: ...3 IDU Installation Duct Connector Connector...
Page 352: ...Product Features 13 Remote LCD Screen Indicators...
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ...email info rotenso com www rotenso com INSTALLER STAMP...