d
065
15.
fm
SI-PAC-001
SERVICE INSTRUCTION -
PAC
08 February 2019
24-30-00
Initial Issue
Page 15 of 21
Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.
Fig. 15.
Fig. 16.
Step
Procedure
3
Push the alternator into the lug of the alternato bracket and fix initially finger-tight with
hex. screws M10x45 and thrust washer 10.1/20/0.5.
Step
Procedure
4
Tighten the pre-mounted Allen screws M6 and M8.
Tightening torque 10 Nm (89 in. lb).
5
Place the V-belt in the V-belt pulley of the alternator.
1 Alternator
2 Washer 10.1/20/0.5
3 Hex. screw M10x45
1 V-belt 9.5x675
2 Allen screw M8x20
3 Allen screws M6x50