
d0
65
1
5
.f
m
08 February 2019
24-30-00
Initial Issue
Page 10 of 21
Copyright - BRP-Rotax GmbH & CO KG. All rights reserved.
SI-PAC-001
SERVICE INSTRUCTION -
PAC
3.4) Maintenance (Heavy) - related information
Safety
information
3.4.1) Preparation
-
Loosen pulley tension
-
Remove the propeller. See “Documentation of aircraft manufacturer”.
3.4.2) V-Belt pulley -removal
See
.
Fig. 6.
3.4.3) Alternator - removal
See
.
m
WARNUNG
m
WARNING
Danger of damage to engine!
There is a risk of short circuits and cable fires during work on the electric
system. All installation work on the electric system should be carried out
with the engine switched “OFF” and the battery (negative terminal) dis-
connected.
Ignition, main and Lane selector switches must be “OFF”.
Step
Procedure
1
Loosen 8 Allen screws M5x16 with lock washers.
2
Remove pulley carries, V-belt pulley and V-belt.
1 Allen screw M5x16
2 Lock washer A5
3 Pulley carries
4 V-belt pulley
5 V-belt
Step
Procedure
1
Loosen 2 hex. screws M8x20 along with lock washers and washers.
2
Remove the tension bar underneath the external alternator.