background image

66

Fig. 11

       For 15'-6" height lift with 472" cable or for 13'-6" height lift with
       424" long cable. Use pattern 3.

For 16' height lift with 472" cable or for 14' height lift with 424"
long cable, both use pattern two. Has 1' spacer provided.

For 15' height carriages use pattern four with 472" cable. Has 1'
spacer provided.

      For 16'-6" height with 472" long cable or for 14'-6" height with
      424" long cable, both use pattern one.

4

3

1

2

Upper Cable Tie Off
3/4" Nylon Insert Locknut

2'

Upper Cable Tie Off
3/4" Nylon Insert Locknut

2'

1'

Upper Cable Tie Off
3/4" Nylon Insert Locknut.

1' Spacer

Upper Cable Tie Off
3/4" Nylon insert locknut.

1' Spacer

Summary of Contents for Sprinter SPO15

Page 1: ...ft All rights reserved IN20379 CO6363 1 Rev A 11 22 2005 I N S T A L L A T I O N I N S T R U C T I O N S SPO15 SPO18 Sprinter SPO15 3A0 Lifts Capacity 11 000 lbs Standard SPO15 300 Series Lifts Capaci...

Page 2: ...n using the standard supplied 3 4 x 5 1 2 lg anchors if the top of the anchor exceeds 2 1 4 above the oor grade you DO NOT have enough embedment Fig 1 Drill 18 3 4 dia holes in concrete oor using hole...

Page 3: ...IEW FROM APPROACH SIDE All Star Washers are to be mounted on the Right side column to ensure grounding of overhead limit switch Star Washers are not needed when mounting to Left Side column Notice the...

Page 4: ...power unit bracket using Push Nuts to hold in place Fig 8a Mount unit with motor up to column bracket and install 4 5 16 star washers and 5 16 Nuts Install and hand tighten Branch Tee to pump until O...

Page 5: ...easier to tie off lower studs rst A Run cable stud up through the lower tie off plate and or bracket s and or spacer s depending on the lift model Fig 11 B Push cable up until stud is above top of car...

Page 6: ...1 spacer provided For 15 height carriages use pattern four with 472 cable Has 1 spacer provided For 16 6 height with 472 long cable or for 14 6 height with 424 long cable both use pattern one 4 3 1 2...

Page 7: ...e Install air line from lowering valve to union tee then to the right column air cylinder K Install air line from union tee to left column air cylin der Fig 14 L Mount lowering valve and bracket to co...

Page 8: ...er valve is open 14 Oil Filling Bleeding Use Dexron III ATF or Hydraulic Fluid that meets ISO 32 speci cations Remove ll breather cap Fig 15b Pour in 8 quarts of uid Start unit raise lift about 2 ft O...

Page 9: ...TABLE THREE PHASE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE 208 240V 50 60Hz 197 253V 400V 50Hz 360 440V 440 480V 50 60Hz 396V 528V 575V 60Hz 518V 632V FOR 3 POWER UNITS Attach Box using M5 x 10 PHMS...

Page 10: ...in Fig 18 so that the rounded edge top side of the gear teeth is fac ing upward Then install the three 3 3 8 16NC x 1 1 2 Lg HHCS 12 total for all 4 arms and 3 8 Spring Lockwashers into the gear and a...

Page 11: ...l if required Repeat air bleeding of cylinders 19 Final Adjustments Raise lift to check equalizer cable tension Below carriage grasp adjacent cables between thumb and fore nger with about 15 lbs effor...

Page 12: ...erved Unless otherwise indicated ROTARY DOVER and all other trademarks are property of Dover Corporation and its affiliates Rotary World Headquarters 2700 Lanier Drive Madison IN 47250 USA www rotaryl...

Reviews: