background image

8

9

8

Fig. 17

Three Phase Power Unit

NOTES:

1.  Unit not suitable for use in unusual conditions.  Contact Ro-

tary for moisture and dust environment duty unit.

2.  Control Box must be field mounted to power unit.  
3.  Motor rotation is counter clockwise from top of motor.

MOTOR OPERATING DATA TABLE - THREE PHASE

         LINE VOLTAGE          RUNNING MOTOR VOLTAGE RANGE 
 

208-240V  50/60Hz. 

197-253V

 

400V 50Hz. 

360-440V

 

440-480V 50/60Hz. 

396V-528V

 

575V 60Hz. 

518V-632V

FOR 3 Ø POWER
UNITS: 

Attach Box using 

M5 x 10 PHMS, Plated

T7

T1

T8

T2

T9

T3

T4

T5

T6

L1

L2

L3

T7

T4

T1

L1

T8

T5

T2

L2

T9

T6

T3

L3

T1

T2

T3

U2

V2

W2

W1

V1

U1

208-240V

50/60Hz.  3Ø

440-480V 50/60 Hz. 3Ø

400V 50 Hz. 3Ø

575V 60 Hz. 3Ø

L1

PE

L2

L3

1

3

5

2

4

6

MOTOR

1

5

7

2

6

8

OVERHEAD SWITCH

(WHERE APPLICABLE)

DRUM

SWITCH

3 Phase

Supply

Summary of Contents for Sprinter SPO15

Page 1: ...ft All rights reserved IN20379 CO6363 1 Rev A 11 22 2005 I N S T A L L A T I O N I N S T R U C T I O N S SPO15 SPO18 Sprinter SPO15 3A0 Lifts Capacity 11 000 lbs Standard SPO15 300 Series Lifts Capaci...

Page 2: ...n using the standard supplied 3 4 x 5 1 2 lg anchors if the top of the anchor exceeds 2 1 4 above the oor grade you DO NOT have enough embedment Fig 1 Drill 18 3 4 dia holes in concrete oor using hole...

Page 3: ...IEW FROM APPROACH SIDE All Star Washers are to be mounted on the Right side column to ensure grounding of overhead limit switch Star Washers are not needed when mounting to Left Side column Notice the...

Page 4: ...power unit bracket using Push Nuts to hold in place Fig 8a Mount unit with motor up to column bracket and install 4 5 16 star washers and 5 16 Nuts Install and hand tighten Branch Tee to pump until O...

Page 5: ...easier to tie off lower studs rst A Run cable stud up through the lower tie off plate and or bracket s and or spacer s depending on the lift model Fig 11 B Push cable up until stud is above top of car...

Page 6: ...1 spacer provided For 15 height carriages use pattern four with 472 cable Has 1 spacer provided For 16 6 height with 472 long cable or for 14 6 height with 424 long cable both use pattern one 4 3 1 2...

Page 7: ...e Install air line from lowering valve to union tee then to the right column air cylinder K Install air line from union tee to left column air cylin der Fig 14 L Mount lowering valve and bracket to co...

Page 8: ...er valve is open 14 Oil Filling Bleeding Use Dexron III ATF or Hydraulic Fluid that meets ISO 32 speci cations Remove ll breather cap Fig 15b Pour in 8 quarts of uid Start unit raise lift about 2 ft O...

Page 9: ...TABLE THREE PHASE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE 208 240V 50 60Hz 197 253V 400V 50Hz 360 440V 440 480V 50 60Hz 396V 528V 575V 60Hz 518V 632V FOR 3 POWER UNITS Attach Box using M5 x 10 PHMS...

Page 10: ...in Fig 18 so that the rounded edge top side of the gear teeth is fac ing upward Then install the three 3 3 8 16NC x 1 1 2 Lg HHCS 12 total for all 4 arms and 3 8 Spring Lockwashers into the gear and a...

Page 11: ...l if required Repeat air bleeding of cylinders 19 Final Adjustments Raise lift to check equalizer cable tension Below carriage grasp adjacent cables between thumb and fore nger with about 15 lbs effor...

Page 12: ...erved Unless otherwise indicated ROTARY DOVER and all other trademarks are property of Dover Corporation and its affiliates Rotary World Headquarters 2700 Lanier Drive Madison IN 47250 USA www rotaryl...

Reviews: