6
Operation
The packaged Leak Detection System is designed to run autonomously with minimal user
interaction required. After the startup procedure in
Chapter 4
, the system needs only a
green light to run.
There are up to three components mounted onto the packaged production line. The
layout of the line is shown schematically in
Figure 6-1
.
Schematic Layout of the System On Line
Figure 6-1:
The packs flow on the schematic above from left to right. The packs pass through the input
gate which is located before the sample head. A space of at least 1 in. (2.5 cm) is required
between packs in order to ensure correct counting and rejection. A space of at least 6 in.
(15.2 cm) is advised for best operation.
The sample head then analyzes the pack/container.
The reject mechanism safely removes faulty containers from the production line without
the need to stop the line. The distances between the components is set at the time of
install and is determined by the speed of the production line.
Operation
Reference Manual
21
Summary of Contents for CT4215
Page 1: ...Reference Manual 00809 0100 4245 Rev AB July 2018 Rosemount CT4215 Leak Detection System ...
Page 12: ...Contents ii Rosemount CT4215 ...
Page 28: ...Installation 16 Rosemount CT4215 ...
Page 30: ...Startup 18 Rosemount CT4215 ...
Page 44: ...Operation 32 Rosemount CT4215 ...
Page 50: ...Maintenance 38 Rosemount CT4215 ...
Page 54: ...Troubleshooting and diagnostics 42 Rosemount CT4215 ...