R
OUTINE
S
ERVICE AND
M
AINTENANCE
245364-U Rosemount Analytical April 2000
7-7
Model 755A Oxygen Analyzer
15. Realign the photocell per Section 7.3.3.
F
IGURE
7-4. M
ODIFICATION OF
633689 C
ONNECTOR
B
OARD FOR
C
OMPATIBILITY
WITH
R
EPLACEMENT
L
AMP
F
IGURE
7-5. L
AMP
A
LIGNMENT
7.3.3 P
HOTOCELL
R
EPLACEMENT AND
A
DJUSTMENT
1. To remove the photocell from the optical bench, perform steps 1 through 5 in
Section 7.3.2.
2. Install replacement photocell by reversing removal procedure.
3. The photocell must now be adjusted. With zero gas flowing:
a. Place a digital voltmeter on the wiper of the front panel ZERO control (R13) and
ground (TP7) ground on the Control Board. Adjust front panel ZERO control for
0.0 VDC.
b. Place the voltmeter from the bottom of R10 and TP7 (see Figure 7-5), adjust
1/4"
Red Mark for
Alignment
Set Screw
Solder Side of Board (Backside)
F3
HR1
Add Straps or Solder Bridges