Installation
EVWM-V01-R1 Installation and Operation Manual
WallPod Intelligent EV Charging Unit
December 2022
Page
20
of
35
Install the Chargepoint
1. Remove (and retain) the 6 screws that secure the front section of the WallPod
enclosure to the rear section.
2. Carefully pull the front of the WallPod enclosure away from the rear section.
CAUTION: Equipment Damage
The front section of the enclosure is connected to the main assembly by electrical
cables. Take care not to damage, strain, or disconnect the cables. Make sure all
connections are secure before refitting the enclosure.
3. Carefully cut a suitably sized hole in the rear section of the enclosure to receive the
power supply cable (and the CT and Ethernet cable if required) and an
appropriate cable gland.
x
Depending on the model of WallPod and the customer’s wishes, the power
cables may be installed through the back of the rear enclosure or from below.
x
Take care not to damage any internal components when cutting holes.
x
Make sure to remove all debris that could interfere with components inside the
WallPod.
IMPORTANT:
All electrical work must be performed in accordance with the current
legislation applicable in the geographical region of the installation.
CAUTION: Equipment Damage – Sensitive Equipment
If you will be performing insulation resistance tests on the power supply cables, it is
advised to be done BEFORE connecting the power cable to the chargepoint. The high
voltages applied during the test may damage sensitive components if tested after the
cable is connected.
CAUTION: Equipment Damage
Do NOT use power tools to remove/install fixings.
Power tools can damage the fixings, making them difficult to remove.
Use hand tools ONLY and do not overtighten fasteners.
IMPORTANT
: If Load Balancing is required, install it before completing the standard
installation. Refer to
page 22, Install Load Balancing
shown immediately after these
‘standard’ installation instructions.
Alternatively, if a third-party Load Balancing or Load Management device/system is to
be used, refer to the manufacturer’s instructions.
IMPORTANT:
WallPods are supplied with pre-drilled mounting holes. If the pre-drilled holes
will not be used, they must be sealed to prevent water ingress.
CAUTION: Equipment Damage
Make sure to support the front section of the chargepoint. Do not strain cable
connections or the cables that run between the front and rear halves of the enclosure.
Summary of Contents for WALLPOD ROLEC4020B
Page 1: ...INSTALLATION OPERATION MANUAL Manufactured in the UK WALLPOD Intelligent EV charging unit...
Page 37: ......
Page 38: ......
Page 39: ......