Installation
WallPod Intelligent EV Charging Unit
EVWM-V01-R1 Installation and Operation Manual
Page
17
of
35
December 2022
2. Make sure the electrical power available at the site is sufficient for the desired
power output from the chargepoint.
x
Chargepoint output power is managed by the chargepoint based on
information about the site entered into the Configuration Application after
installation.
x
Maximum
output per socket/plug
is 230V/50hz, 7.4kW (32A).
3. Determine where power and other cables (CT and Ethernet – if required) will enter
the chargepoint enclosure.
x
Discuss cable routing and cable entry into the enclosure with the end user. Plan
the installation accordingly.
x
Depending on the model of chargepoint, cables may enter through the
bottom or back of the rear half of the enclosure. Cable entry through the sides
or top of the chargepoint is NOT recommended.
4. If required, obtain fixings suitable to mount the WallPod in the chosen location.
x
The holes for wall mounting the enclosure are pre-made at 5 mm diameter.
5. Make sure that the WallPod and any options or accessories have not been
damaged in transit.
6. Make sure the unit model is correct and matches the order.
NOTE:
Items damaged in transit must first be reported to the courier and then to the
supplier. Where possible, photographic evidence of package and/or item damage
should be provided.
NOTE:
Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.
7. Make sure a remote consumer unit has been installed (or appropriate switchgear is
available) in an appropriate location to supply power to the chargepoint. The
consumer unit must contain appropriately rated protective devices for the power
output that will be configured on the charger.
x
For total outputs of up to 32A, a 30mA Type A RCBO of appropriate rating must
be used.
8. Familiarise yourself with the schematic that is relevant to the product to be installed.
If a Mounting Post Will be Used
1. Prepare the ground and place the mounting post in the desired location.
x
Make sure the power supply cable, the ethernet cable (if required), and the
Load Balancing CT cable (if required) are fed upward through the middle of
the post and exit through one of the apertures. Seal other apertures with the
provided blanking panels.
2. Secure the post into place with fixings that are appropriate for the mounting
surface.